TACLOBAN CITY — The Biliran Bridge has been cleared to accommodate all types of vehicles again after the completion of repair works that restored its original 15-ton maximum allowable load capacity, the Department of Public Works and Highways (DPWH) said. DPWH-Biliran District Engineering Office District Engineer Irwin Antonio said the lifting of vehicle-type restrictions followed